Products Knowledge

Hengwang Loader Operation Standards‌

Date: May 19, 2025

Leveling Operations‌

1.Reverse Gear Preference‌

  • For grading tasks, prioritize reverse gear movement. When forward grading is necessary, maintain bucket rollback angle ≤20° for optimal material control.

2.Three-Step Grading Method‌

  • Material Collection‌: Engage bucket at low RPM, then increase throttle gradually to prevent wheel spin

  • Spreading‌: Keep teeth grounded, utilizing rear traction force for even distribution

  • Fine Grading‌: Activate hydraulic float mode for precision surface finishing


Loading & Hauling Protocols‌

1.Transport Configuration‌

  • Lower bucket to maintain 15-30cm ground clearance during transit for stability

2.Efficiency Cycle‌

Standard workflow includes:

  • Material excavation

  • Short-distance transport

  • Targeted unloading

3.Route Management‌

  • Maintain designated haul roads to reduce tire wear

  • Maximum efficiency within 100m range; recommended speed limits:

    • Paved surfaces: ≤25km/h

    • Rough terrain: ≤15km/h


Safety Alerts‌

  • Never lift loads while moving to prevent rollover accidents

  • On soft ground, reduce tire pressure or use graded approach techniques


Request a quote

If you have any questions or inquiries, please leave us a message, and we will respond within one business day!