Material: Soil & Gravel Handling
1. Pre-Operation Preparation
Level worksite and remove debris through Hengwang standard site assessment procedures
Conduct routine tire pressure checks using Hengwang approved gauges
2. Gear Selection
Loose materials: Operate in 1st/2nd gear (Hengwang Basic Mode)
High-density materials: Mandatory 1st gear operation
3. Bucket Positioning
Maintain 30cm ground clearance during approach
Execute controlled bucket descent to prevent impact
4. Loading Techniques
Soil: Position bucket horizontally
Gravel: Apply 5° downward bucket tilt
Centralize load distribution using alignment markers
5. Motion Control
Complete gear shifts before material contact
Maintain 1st gear operation during
6. Load Management
Verify load volume via visual inspection
Execute controlled bucket shake-off for overload correction
If you are interested in loaders, please contact us!